Fact Sheet: Outlook for Energy Storage in PJM
The report urges PJM and state policymakers to take decisive action by:
- Accelerating interconnection approvals to eliminate unnecessary delays in connecting new energy storage resources to the grid.
- Reforming market rules to harness the full potential of energy storage ensuring that it can provide the full range of services it is designed to deliver.
- Streamlining and clarifying permitting at the state and local level to ensure new energy infrastructure can be built quickly, safely, and responsibly. Consistent standards for permitting energy storage projects can help lower costs and reduce project development timelines.
Download the full report here.
The research in this fact sheet was conducted by Brattle, a third party.